Completion Year
Brewery District 6

Sustainability
What We Delivered
Softscape Installation
Tree canopy and foundation planting composition developed to establish visual greenery along 200 Keary Street frontage. Species selection emphasizes drought tolerance and urban resilience for sustained performance in the Brewery District context.
Irrigation & Water Systems
Integrated irrigation infrastructure serving both street-facing planters and internal courtyards. System design accommodates retrofit conditions within active construction environment, with phased commissioning alongside building occupancy.
Paving & Surface Works
Large-scale hardscape defining public circulation, seating zones, and landscape features. Material palette includes permeable pavers minimizing stormwater impact and durable concrete edges supporting heavy foot traffic from adjacent public realm.
Site Furnishings
Site furnishings including benches, waste receptacles, and custom planters integrated into landscape design. Materials selected for public-realm durability and minimal maintenance in mixed-use setting.

Project Result
Public-realm landscape delivery for a mixed-use residential complex in Brewery District. Hardscape, planting, and furnishing systems provided durable shared spaces coordinated with adjacent building interfaces & masterplan community design












